Predicting-power-output-next-6-months-from-Wind-Turbine
- Main task was to tackle the problem of seasonality in the data
- Used a data collected from a wind turbine for a whole year (2015)
- Used several machine learning algorithms like:- BART, MART, Random forest, NeuralNet, Binning
- Predicted wind power output from the turbine for next 6 months(Jan 2016 - June 2016)
- Got minimum error with ensemble method (Binning + MART)
- This method tackled seasonality very efficiently
- My team(3 member including me) got the first place among 10 teams participating
- Got A grade and a lunch from the professor :D :D